About the project

AI infrastructure.
Built for the future.

Calliseom is a project of I.S.T — Innovative Strategic Technologies: Central Asia’s first Tier IV data center and AI compute campus, built in the Republic of Uzbekistan.

Calliseom campus
Our mission

Compute, created here — not imported.

To create computing capacity inside Uzbekistan — not consume it from other regions — and supply it to external markets. Calliseom controls the full infrastructure cycle: energy, facility, network, GPU compute, cloud and client delivery, within a single perimeter.

The campus is designed underground — four floors at 16–20 m depth — for thermal stability, seismic performance and a level of physical protection no surface facility can match. The target architecture is Tier IV: fault tolerant, 2N at every level.

Beyond infrastructure, we are building Calliseom OS — an in-house, AI-native operating system for the entire campus — and a national skills base of data center, GPU, network and AI operations engineers.

The companies behind Calliseom

IST Innovative Strategic Technologies LLC
Delaware, USA

IST Innovative Strategic Technologies OOO
Tashkent, Uzbekistan · IT Park resident

Status

Project in progress — entity registered, land agreed, dual 220 kV power and dual 400G connectivity confirmed, local CEO appointed, HQ approved.

Leadership

The company behind the discovery

Calliseom Inc. (Delaware, USA) — established by IST Innovative Strategic Technologies US LLC, operating from Tashkent with an established local presence. One team across the US, Israel and Uzbekistan — founders who build, not plan.

Shimon Shaham
Shimon Shaham

Partner

Roman Eremine
Roman Eremine

Founder & Chief Executive Officer

Aleksandr Kolesnikov
Aleksandr Kolesnikov

General Director, Uzbekistan Operations

Backed by international advisors — Owner’s Engineer, Uptime-certified design, Washington export-controls counsel and Big-4 tax.

Want to be part of it?

We’re hiring across engineering, operations and R&D.