What is Calliseom?

Calliseom is building an underground, Tier IV-designed data center and AI compute campus in the Republic of Uzbekistan. It covers the full infrastructure cycle - energy, facility, network, GPU compute, cloud services and client delivery - within a single perimeter, and exports 100% of its services to international customers.

Why is the campus underground?

Four underground floors at 16-20 m depth provide consistent year-round temperature, engineered seismic resilience and a physical security perimeter unreachable by vehicle, drone or standoff attack. A 52-60 m groundwater buffer sits below the facility.

What does Tier IV-designed mean in practice?

Fault tolerance: two fully independent power channels (13+ MW each), 2N redundancy across power and cooling, no single point of failure, and target availability of 99.995% and above. Uptime Institute certification of the design and of the constructed facility is targeted.

What services will be available?

Two products. The AI Power Campus: GPU Cloud, Dedicated (bare-metal) GPU, Private AI Cloud and Sovereign AI, plus contracted MW of high-density racks. The Independent Recovery Zone: immutable backup, cyber-vault, warm standby and compliance-ready recovery in a separate jurisdiction. Both are monitored 24/7.

How is data routed internationally?

Over two independent international routes, including the Trans-Caspian Corridor, with direct, low-latency connections to the USA, Canada, Europe and Israel and no transit through high-risk jurisdictions. Throughput starts at 2 x 400G and scales to 2+ Tbit/s.

What compliance standards are targeted?

ISO/IEC 27001, ISO 22301 and SOC 2 Type II, PCI-DSS readiness, CMMC Level 2-aligned controls for the government tier and a NIST SP 800-207 zero-trust architecture. These are targets on our roadmap, not certifications held today.

What stage is the project at?

Project in progress. Completed: registered entities, banking, IT Park residency, agreed land application, dual 220 kV power confirmed by NEGU, dual 400G confirmed by Uzbektelecom, geological approval, local CEO and HQ.