Calliseom/Campus

A campus engineered below the surface.

Energy, facility, network, GPU compute and cloud services inside a single perimeter - from engineering infrastructure to a ready computing service.

10MWIT load in Stage 1
26+MWDual power capacity
847haZone, plus an 800+ ha expansion option
4Underground floors at 16-20 m depth

Underground by design

Built deep. Built to outperform.

Four underground floors at 16-20 m depth, above a 52-60 m groundwater buffer. The ground itself becomes part of the protection and cooling envelope.

  • Depth16-20 m below ground, four floors of halls and plant.
  • Groundwater52-60 m buffer below the lowest level.
  • ThermalStable temperature all year round.
  • SeismicEngineered for maximum resilience.
  • TopologyTier IV-designed, fault-tolerant architecture. Uptime Institute certification of design and constructed facility is targeted.
Concept visual of an underground GPU data hall
Concept visual

Tier IV-designed

Fault tolerant by design.

2N redundancy at every level, from the grid input to distribution in the halls. Any component can be taken offline without affecting the service.

Independent power paths

Two fully independent inputs, with A and B distribution to every rack.

No single point of failure

Mission-critical systems with 2N redundancy.

Redundant cooling

Independent cooling circuits, chillers and pumping stations.

99.995%+ target

Target availability for engineering systems and IT workloads.

Power

Two independent 220 kV feeds. No multi-year queue.

A 26+ MW dual power architecture: two fully independent 13+ MW channels with separate inputs, substations and equipment, hot reserve at 2N. Contracted at 5-7 cents per kWh for qualifying projects, against EUR 0.18 on average in the EU.

2 x 220kVIndependent grid feeds
2 x 13+MWChannel A and channel B
10MWOn-site solar: 25,000 panels on 35 ha
30%+Of national generation renewable

Network

2 x 400G to the world, over two independent routes.

Dual 400G international connectivity is confirmed with the national carrier, with two independent carriers per site and contractually clean routing.

  • International2 x 400G uplinks over two independent routes.
  • Scaling400 Gbit/s, then 800 Gbit/s, 1.6 Tbit/s and 2+ Tbit/s, step by step.
  • Sovereign routingOver the Trans-Caspian Corridor to the USA, Canada, Europe and Israel, with no transit through high-risk jurisdictions.
  • WestboundThe new Trans-Caspian fiber (up to 400 Tbps, due end-2026) adds a route west.
  • GPU fabricInfiniBand / Ethernet 400G+ with low latency inside the halls.
Concept visual

Cooling

Closed-loop cooling. Months of free air.

A dry continental climate with cold winters allows months of outside-air cooling every year. Closed-loop liquid cooling keeps water use minimal - a clear ESG advantage.

  • Closed loopMinimal water use for high-density GPU racks, with liquid and precision cooling.
  • 2N chillersHigh-efficiency chillers, redundant circuits and pumping stations, 24/7.
  • Per hallPrecise control: chilled water supply around 22°C, relative humidity around 45%.
  • Free coolingOutside-air cooling during the cold months lowers energy use.
  • OptimisedCOS-AI recommends load and cooling settings against the energy tariff.
Concept visual

Stage 1 specification

8,000 GPUs inside one perimeter.

AI Power Campus
GPU fleet1,000 NVIDIA H100 SXM5 NVL8 servers
GPUs8,000
IT load10 MW
PowerDual 220 kV feeds, battery backup
International2 x 400G, two independent routes
FacilityUnderground, Tier IV-designed halls
Physical securityMantraps, biometric access, CCTV, visitor logs
Operations24/7 NOC and SOC on Calliseom OS
Customers100% export to international customers
Concept visual of 8-GPU server trays
Concept visual

Scale path

From 10 MW to a 1 GW campus network.

10 MWLaunch

Stage 1, 2026-2027.

100 MWGrowth

Additional pavilions.

500 MWScale

Multi-site expansion.

1 GWCampus network

Regional leadership from 2029.

Plan your capacity with us.

Request a technical briefing on power, network, cooling and the Stage 1 fleet.